A system introduced in 2013 would bury an extra 60 miles (97 km) of main electrical power strains in the course of the district. Tom (July 24, 2013). "Why Is Washington, D.C. Called the District of Columbia?". Jamie R. Liu (July 14, 2011).
Also visit my blog ::
Highly recommended Resource site